Lbl-lighting 2-Circuit MO Rigid Standoff Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Osvětlení Lbl-lighting 2-Circuit MO Rigid Standoff. LBL Lighting 2-Circuit MO Rigid Standoff User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 4
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Installation Instructions for
Telescoping Rigid Standoffs
1.1
HANGER-ADJ-_-2(-BJ)
980MR2TSP
1
GP I :ENERAL RODUCT NFORMATION
This product is suitable for indoor dry locations only.
This product must be used only with LBL 2-Circuit Monorail or
LED-Illuminated Monorail systems.
This instruction is for the following models:
Monorail Support 2.5" - 4" (HANGER-ADJ-_1-2)
Monorail Support 6" - 10" (HANGER-ADJ-_2-2)
Monorail Support 12" - 24" (HANGER-ADJ-_3-2)
Monorail Support 24" - 48" (HANGER-ADJ-_4-2)
Monorail Support 48" - 96" (HANGER-ADJ-_5-2)
Above model numbers with -BJ suffix (vaulted ceilings).
Install the Ceiling Anchor
2-Circuit Monorail
ANCHOR
Select a location on the ceiling where the Monorail is to be
mounted.
One way of marking the standoff locations on the ceiling is to
lay the Monorail on the floor underneath of the selected
location and by using a plumb bob pointing on the center of
the Monorail, mark the points on the ceiling.
Another way is to hold the Monorail directly against the ceiling
and mark the standoff points on the ceiling.
Tap the anchors at the marked points up to the threaded
portion with a hammer.
Screw the anchors in the rest of the way with a Phillips
screwdriver.
Insert the #8 screw into the threaded nipple and washer.
Tighten the #8 screw completely into the anchor to secure the
washer and threaded nipple.
Repeat these steps for each standoff.
ANCHOR
WASHER
#8 SCREW
THREADED NIPPLE
CEILING
1B
1A
1
2
3
4
6
5
4
6
1B
1A
5
7
1B1C
Zobrazit stránku 0
1 2 3 4

Shrnutí obsahu

Strany 1 - Telescoping Rigid Standoffs

Installation Instructions forTelescoping Rigid Standoffs1.1HANGER-ADJ-_-2(-BJ)980MR2TSP1GP I :ENERAL RODUCT NFORMATIONThis product is suitable for ind

Strany 2

2Loosen the M4 set screw on the support(Do Not Remove)post with the 2 MM Allen wrench provided and remove thesupport post.2 MM ALLEN WRENCHM4 SET SCRE

Strany 3 - HOUSING CAP

Install the 2-Circuit MonorailRemove the housing cap on all standoffs.1HOUSING CAPPlace a section of the Monorail into standoff housings.While support

Strany 4 - SAVETHESE INSTRUCTIONS!

47400 Linder Ave, Skokie, IL 60077800.323.3226 - 847.626.6300www.lbllighting.com© 2014 LBL Lighting.All rights reserved.The "LBL Lighting"

Komentáře k této Příručce

Žádné komentáře